Close

Please select your country or region to be
directed to the appropriate Lesker site.

SMA Feedthroughs Cabling Instructions & Specifications

Features

  • Feature grounded or floating shields
  • Include air-side cable connectors
  • Single and Double-Ended versions available

1) Cut jacket, braid, and dielectric as shown below. Slit jacket on both sides as shown below. Tin exposed conductor.

2) Move locking nut over cable. Slide ferrule under braid and jacket until rear of ferrule is flush with dielectric. Trim jacket and braid if needed.

3) Press insulator flush with ferrule, press contact over conductor, and solder in place.

4) Finally, insert cable assembly into housing and tighten locking nut.

Contact Us
Contact Us
Questions? Let's Talk!
Contact your dedicated Lesker sales team today.
+1 800 245 1656
Contact Us - SMA Feedthroughs Cabling Instructions & Specifications